HB Ref No:
HB16/02/065


Extent of Listing:
Not listed


Date of Construction:
1940 - 1959


Address :
Slieve Bignian tunnel Silent Valley Reservoir Head Road Kilkeel Newry Co Down BT34 4PU


Townland:
Carrigenagh Upper






Survey 2:
Record Only

Date of Listing:

Date of De-listing:

Current Use:
Water Works Structures

Former Use
Water Works Structures

Conservation Area:
No

Industrial Archaeology:
Yes

Vernacular:
No

Thatched:
No

Monument:
No

Derelict:
No




OS Map No:
268/16

IG Ref:
J3086 2276





Owner Category


Central Govt

Exterior Description And Setting


The tunnel conveying the headwaters of the Annalong River into the Silent Valley reservoir emerges from the west side of Slieve Bignian through a segmental opening edged with a stepped vee-jointed concrete blocks. The rock above the opening is also faced with vee-jointed blocks in regular courses, above which is a section of shuttered concrete bearing the date ‘1952’. The wall is topped with ashlar granite blocks. The intake to the tunnel is in the Annalong Valley - see HB16/01/041. The water flows along a concrete-lined open channel into a circular concrete pipe underneath the road and bank which feeds into the reservoir. The parapets on either side of the road are of roughly dressed granite blocks in regular courses with quarry faced copings. The east parapet bears a bronze plaque commemorating the tunnel’s opening in 1952. The end of the pipe is embellished with a horseshoe shaped trimming of vee-jointed cement blocks. The bank is similarly faced. The water discharges onto a shallow apron pitched with large granite blocks.

Architects


Binnie Deacon & Gourley

Historical Information


Originally the Belfast Water Commissioners envisaged that there would be a reservoir in the upper reaches of the Annalong Valley. However, after encountering major geological problems with the construction of the Silent Valley dam, this idea was abandoned in favour of a tunnel through Slieve Bignian, which would divert the Annalong River into the Silent Valley. Excavation of the tunnel commenced in April 1948. The contractors were Messrs A.M. Carmichael of Edinburgh, and the consulting engineers Messrs Binnie, Deacon and Gourley of Westminster. Work was carried out simultaneously from both ends, and the two headings met in December 1950. The tunnel is 3.4 km (2 1/8 miles) long with an overall fall of 5.5m (18ft). It is 2.3m (7ft 6in) wide by 2.45m (8ft) high and the walls are lined with concrete to a height of 1.25m (4ft). Viscount Brookeborough, Prime Minister of N. Ireland, opened it on 28 August 1952. Primary sources: 1. Plaque on bridge at tunnel exit, and also on 1950 screening chamber below Silent Valley dam. 2. Original drawing of the tunnel and weir in DOE Water Service, Westland House, Old Westland Road, Belfast (cat. No. 2F1). Secondary sources: 1. J.A. Robbie, ‘The Slieve Binnian tunnel: an aqueduct in the Mourne Mountains, Co Down’, in Bulletin Geological Survey of Great Britain, vol.8, pp.1-20. (1955).

Criteria for Listing


Architectural Interest

Not listed

Historic Interest

Not listed Not listed Not listed



Evaluation


The tunnel was a novel solution to the problems encountered with tapping the waters of the Annalong River and is the longest tunnel in N. Ireland. It is of national interest in being part of the Mourne Scheme to supply Belfast with water. It also adds interest to the landscape where it emerges. PHB have asked that consideration be given for inclusion on Schedule of Historic Monuments by Protecting Historic Monuments.

General Comments




Date of Survey