Skip to content
Buildings(v1.0)

Historic Building Details


HB Ref No:
HB16/01/040


Extent of Listing:
Intercepting Weir


Date of Construction:
1940 - 1959


Address :
Intercepting Weir At grid J3435 2438 Near Annalong Newry Co Down


Townland:
Mullartown Upper






Survey 2:
B2

Date of Listing:
11/04/2008 00:00:00

Date of De-listing:

Current Use:
Water Works Structures

Former Use
Water Works Structures

Conservation Area:
No

Industrial Archaeology:
Yes

Vernacular:
No

Thatched:
No

Monument:
No

Derelict:
No




OS Map No:
269

IG Ref:
J3435 2438





Owner Category


Central Govt

Exterior Description And Setting


A vertical reinforced-concrete weir across a tributary on the upper section of the Annalong River. Its purpose is to divert some of this water through a south-west running underground conduit to a small reservoir at the intake to the Slieve Bignian tunnel (HB16/01/041). Excess water spilled over the top of the weir, the height of which is fixed. At the top end of this structure is a set of vertical sluices set between concrete abutments. When closed, the water was diverted away from the weir, through a culvert on the left bank to a discharge orifice just beyond the weir. This enabled access to the conduit for maintenance purposes. The sluice gates have now been removed and the bypass is redundant. The banks between the sluices and weir comprise vertical concrete walls. There are concrete footbridges at both ends, each with two horizontal spans and metal two-bar handrails. A small metal pipe also discharges from the bottom of the weir, the flow being regulated by a valve controlled from the footbridge above.

Architects


Binnie Deacon & Gourley

Historical Information


The Slieve Bignian Tunnel scheme, of which this dam is a component, was commenced in 1948 by the Belfast City & DistrictWater Commissioners and completed in 1952. The work was carried out by Messrs A.M. Carmichael Ltd of Edinburgh and theconsulting engineers were Messrs Binnie, Deacon & Gourley of Westminster. The weir is still used by the Water Service for its original purpose. Primary Sources: 1) Belfast & District Water Commissioners, 'The Mourne Scheme: development of the Silent Valley and AnnalongValley catchments', (1959), pp.25-7. 2) Original drawings of the weir are held by the Water Service at Westland House, Old Westland Rd, Belfast (cat no.2F1).

Criteria for Listing


Architectural Interest

A. Style D. Plan Form F. Structural System J. Setting K. Group value

Historic Interest

V. Authorship X. Local Interest Y. Social, Cultural or Economic Importance



Evaluation


This structure is an integral part of of the Bignian Tunnel complex (HB16/01/041), which in turn is a key element of Belfast's water supply. It therefore has group value and is of significance in terms of the Mourne Scheme.

General Comments




Date of Survey


07 June 1997